 |
 |

|
 |
Berth
Details
Berth Details as on 10.07.2007
| Sl. No. |
Name of Berth |
Capacity of Cranes |
Length In (Meters) |
Max. Permissible Draft
In (Meters) - Dock Density varies between
1019-1025 |
Date of Survey |
|
Jawahar Dock
|
| 1 |
J.D-1 |
10 T(J)-1
No |
218.33 |
10.40 |
05.01.07 |
| 2 |
J.D-3 |
10 T(ABG)-3Nos |
218.33 |
10.40 |
08.12.06 |
| 3 |
J.D-5 |
Under
BRS Scheme |
218.33 |
10.40 |
01.02.07 |
| 4 |
J.D-2 |
G1 -20T -1No |
218.33 |
11.00 |
15.06.07 |
| 5 |
J.D-4 |
G2
-20T -1No |
218.33 |
11.00 |
07.06.07 |
| 6 |
J.D-6 |
G3 -20T -1No |
218.33 |
11.00 |
27.03.07 |
|
Ambedkar Dock
|
| 7 |
NQ |
|
198.00 |
8.50 |
21.11.06 |
| 8 |
W.Q-1 |
10T-1Nos |
170.60 |
11.00 |
12.06.07 |
| 9 |
W.Q-2 |
15T-1Nos |
170.60 |
12.00 |
17.05.07 |
| 10 |
C.B |
15T-1 Nos |
170.60 |
12.00 |
29.06.07 |
| 11 |
W.Q-3 |
10T -
1 No |
170.60 |
12.00 |
18.01.07 |
| 12 |
W.Q-4 |
10T - 1 No |
170.60 |
11.00 |
23.01.07 |
| 13 |
S.Q-1 |
10T(J)-2Nos,
10T(ABG)-1No, 50T(H)-1No |
246.00 |
9.50 |
12.02.07 |
| 14 |
S.Q-2 |
10T(J)-2Nos |
179.00 |
9.50 |
05.02.07 |
| 15 |
S.Q-3 |
|
-- |
-- |
Handed over to 2nd Container
Terminal |
| 16 |
E.Q (Center) |
|
-- |
-- |
Handed over to 2nd Container
Terminal |
| 17 |
E.Q (South) |
|
-- |
-- |
Handed over to
2nd Container Terminal |
| 18 |
Naval Berth North |
|
60.00 |
09.00 |
14.02.07 |
| 19 |
Naval Berth South |
|
140.00 |
12.00 |
14.02.07 |
|
Bharathi Dock
|
| 20 |
B.D-1 |
Loading
Arm - 5 Nos |
338.94 |
14.60 |
10.11.06 |
| 21 |
B.D-3 |
Loading Arm - 5 Nos |
304.00 |
16.50 |
14.11.06 |
| 22 |
B.D-2 |
Ship
Loader - 2 Nos |
274.32 |
16.50 |
22.11.06 |
|
Container Terminal
|
| 23 |
C.T-1 |
RMQC-6 Nos
RTG-14 Nos
RTG-2Nos(ABG) |
200.00 |
13.40 |
22.05.07 |
| 24 |
C.T-2 |
200.00 |
13.40 |
24.01.07 |
| 25 |
C.T-3 |
200.00 |
13.40 |
06.02.07 |
| 26 |
C.T-4 |
285.00 |
13.40 |
02.02.07 |
|
Approach Channel
|
|
| Zone 1 |
|
750.00 |
|
|
| Zone - II to Zone -
VII |
|
5950.00 |
|
|
| Turning Circle |
|
560.00 |
|
|
<
Top > |
 |