Facilities @ Port

Oil Terminals (BD1 & BD3)

F

Oil berth at Bharathi Dock-I commissioned in 1972 can handle tankers up to 100,000 DWT

F

Another one commissioned in 1986 at Bharathi Dock-III can handle tankers up to 140,000 DWT

F Maximum LOA of Tankers Berthed at BD - I & BD - III - 280.4m (920 ft).
F Minimum LOA of the ship so far Berthed at BD - I - 108.15m.
F

Capacity - 12 Million Tonnes Per Annum

F

Installed with 5 Marine Loading Arms in each berth. Berths laid with 762 mm (30") dia pipelines for conveying Crude, 500 mm (20") dia pipeline for conveying White Oil Product and 350 mm (14") dia pipelines for conveying Furnace Oil.

F

Separate Pipelines for Crude, Furnace Oil, White Oil Products, Deballasting, Tower Monitor, Fire Hydrant and Fresh Water

F

Service Lines for LDO Bunker, Furnace Oil Bunker and Lubricant Oil Bunker

F

The facilities include pumping at the rate of 3000 Tonnes per hour for Crude oil and 1000 Tonnes per hour for Petroleum Products.

F

Provision of Oil reception facilities in accordance with MARPOL convention for receiving oily ballast, sludge and slop.

F

Both the jetties are equipped with fire monitors

F

There is a separate fire fighting pump house with diesel and electrically driven pumps to supply fire hydrant and tower monitors.

Iron ORE Terminals (BD2 )

F Mechanised Ore handling Plant commissioned in 1977 at Bharathi Dock-II
F Can handle Ore carriers of maximum size and LOA of 280.4 metres
F Capacity - 6 Million Tonnes Per Annum
F Loading rate - 6000 Tonnes per hour
F Capable of receiving, stockpiling, reclaiming, weighing, sampling and ship loading
F Ore handling facilities consists of two rotary wagon tipplers, ten lines of conveyors, two rail-mounted stackers, two rail-mounted bucket-wheel reclaimers and two rail-mounted shiploaders.
F Equipped with automatic belt weigher, sampling facilities, self-contained maintenance workshop and a service station
F Separate receiving line and shipping line, which can also function as interconnected system
F Availability of two control rooms for the automatic operation of various equipment and conveyors.
F Well connected rail lines
F Back-up of 33 KV receiving sub-station
F Ore Stock Yard - Capacity - 6 Lakh tonnes
F Rotary Wagon Tippler can handle 1200 MT/hr at the rate of 20 wagons per hour
F Receiving Conveyors (4 Nos.) can handle 1500 MT/hr each
F Shipping Conveyors (6 Nos.) can handle 4000 MT/hr each
F Rated capacity of Stackers - 1500 MT/hr each
F Rated capacity of the Reclaimer - 3000 MT/hr each
F Rated capacity of Shiploaders - 3000 MT/hr each

Container Terminal (CTB 1, CTB 2, CTB 3, CTB 4 )

General Cargo Terminal

BERTH

NO. OF CRANES

CAPACITY

WEST QUAY1

1 10 T

WEST QUAY2

1 15 T

CENTER BERTH

1 15 T

WEST QUAY 3

1 10 T

WEST QUAY 4

1 10 T

SOUTH QUAY 1

4 10 T-3Nos. 50 T-1 No

SOUTH QUAY 2

2 10 T

SOUTH QUAY 3

2 15 T

JAWAHAR DOCK 1

1 10 T
JAWAHAR DOCK 3 3 10 T
JAWAHAR DOCK 5 (PRIVATISED BERTH) BRS BRS

JAWAHAR DOCK 4 & 6

3 20T

Other Facilities

CARGO HANDLING EQUIPMENT

SL.NO. EQUIPMENT NUMBERS CAPACITY
1 FLOATING CRANE 1

150 TONS

2 MOBILE CRANE 5
8 TONS - 2 Nos, 
10 TONS - 3 Nos
3 LOW CAPACITY DIESEL FORK-LIFT TRUCK 37

3 TONS

4 HIGH CAPACITY DIESEL FORK-LIFT TRUCK 13
10 TONS - 6 Nos 
15 TONS - 5 Nos.
2 TONS - 2 Nos.
5 PAYLOADER 1

4 TONS

6 DIESEL ELECTRIC LOCOMOTIVE 14
700HP - 12 Nos.
1400HP - 2 Nos.

 